Chilime Engineering & Services Company Ltd. has submitted the Feasibility study report and is currenty undertaking the preparation of EPC tender documents and EIA study of Seti Nadi-3 Hydroelectric Project owned by Chilime Hydropower Company and located in Bajhang District.
Location: Bajhang
River: Seti Nadi
Type: Peaking Run-of-river
Design Discharge: 84.6 m3/s
Gross Head: 126.76 m
Installed capacity: 87 MW
Annual Energy: 477.97 GWh
Client: Chilime Hydropower Company Ltd.