Chilime Engineering & Services Company Ltd. has completed the topographical survey and submitted the Feasibility study, and is currently undertaking the preparation of EPC tender documents and EIA study of Budhi Gandaki Prok Hydroelectric Project
Location: Gorkha
River: Budhi Gandaki
Type: Run-of-river
Design Discharge: 105.5 m3/s
Gross Head: 660 m
Installed capacity: 420 MW
Annual Energy: 2395.54 GWh
Client: Chilime Hydropower Company Ltd.