CHILIME HYDROPOWER PLANT - LANDSLIDE MITIGATION ON CAMP SITE

CHILIME HYDROPOWER PLANT - LANDSLIDE MITIGATION ON CAMP SITE
Project Title : CHILIME HYDROPOWER PLANT - LANDSLIDE MITIGATION ON CAMP SITE
Location : Rasuwa
River : 22.1 MW
Type : Peaking Run-of-River

Chilime Engineering & Services Company Ltd. is providing consulting services to CJCL to carry out the detail study of the landslide that occurred at the campsite at Syafrubensi, Rasuwa and to provide the suitable environment-friendly and sustainable mitigating measures. The team has successfully conducted a geotechnical assessment and intensive study of the landslide area based on field data and has recommended suitable mitigation measures for slope protection.