Chilime Engineering & Services Company Ltd. has completed the topographical survey and submitted the layout report and is currently undertaking the Feasibility study, preparation of EPC tender documents and EIA study of Chumchet Syar Khola Hydroelectric Project.Gorkha District owned by Chilime Hydropower Company.
Location: Gorkha
River: Syar Khola
Type: Run-of-River
Design Discharge: 17.14 m3/s
Gross Head: 440 m
Installed capacity: 60 MW
Annual Energy: 348.05 GWh
Client: Chilime Hydropower Co. Ltd