Chilime Engineering & Services Company Ltd. has successfully completed the Rehabilitation of Chilime Hydropower Plant located in Rasuwa and is now in defect liability period.
Location: Rasuwa
River: Chilime Khola
Type: Peaking Run-of-River
Design Discharge: 7.5 m3/s
Gross Head: 351.5 m
Installed capacity: 22.1 MW
Annual Energy: 137.9 GWh
Client: Chilime Hydropower Co.Ltd.