Chilime Hydropower project (22.1 MW) holds a prestigious history of constructing a project which has its own complete experience in engineering design and management, and site supervision including operation and maintenance of 22.1 MW Chilime hydropower project. It was a long way back when there wasn’t substantial development of hydropower in the nation. Having many hydropower projects under construction, ChesCo has a strong technical team to handle the various project assignment. On top of the glorious history of CHCL, it should also be noted that CHCL has a strong collaboration with the government of Nepal. The statement is justified by the 51% share of NEA in CHCL; and ChesCo, being a subsidiary company with 100% ownership of CHCL, holds a strong assurance from CHCL by both technical and managerial aspects. The other benefits of working with ChesCo are as follows: