SETI NADI-3 HYDROELECTRIC PROJECT
Seti Nadi-3 HEP (SN3HEP) is located in Jayprithivi Municipality of Bajhang District. Chilime Jalavidhyut Company Limited (CJCL) has identified the project and has also acquired the study license to conduct the Feasibility Study. SN3HEP is a Peaking Run of-River type project with proposed design Discharge 84.6 m3/s at Q35.20% with net head 115.78 m and Installed Capacity 87 MW. ChesCo has undertaken the Feasibility Study, Environment Impact Assessment (EIA) Study and Preparation of Tender Documents Activities.