
SETI NADI-3 HYDROELECTRIC PROJECT
Chilime Engineering & Services Company Ltd. has submitted the Feasibility study report and is currenty undertaking the preparation of EPC tender documents and EIA study of Seti Nadi-3 Hydroelectric Project owned by Chilime Hydropower Company and located in Bajhang District.
Location: BajhangRiver: Seti NadiType: Peaking Run-of-riverDesign Discharge: 84.6 m3/sGross Head: 126.76 m
Installed capacity: 87 MWAnnual Energy: 477.97 GWhClient: Chilime Hydropower Company Ltd.