Skip links
Seti Nadi 3

SETI NADI-3 HYDROELECTRIC PROJECT

Chilime Engineering & Services Company Ltd.  has submitted the Feasibility study report and is currenty undertaking the preparation of EPC tender documents and EIA study of Seti Nadi-3 Hydroelectric Project owned by Chilime Hydropower Company and located in Bajhang District.

Location: Bajhang

River: Seti Nadi

Type: Peaking Run-of-river

Design Discharge: 84.6 m3/s

Gross Head:  126.76 m

Installed capacity: 87 MW

Annual Energy:  477.97 GWh

Client: Chilime Hydropower Company Ltd.