Skip links
Kathmandu Valley TL Project

Kathmandu Valley Transmission System Expansion Project

As part of the Kathmandu Valley Transmission System Expansion Project under the Transmission Directorate of Nepal Electricity Authority (NEA), Chilime Engineering & Services Company Limited (ChesCo) conducted geotechnical investigations for two substations:

1.Banepa 132/11 kV Substation (Package "E") Located in Banepa Municipality-5, Kavrepalanchowk,
2.Goldhunga 132/11 kV Substation (Package "A"), Situated in Tarkeshor Municipality, Kathmandu,

ChesCo has completed the soil investigations works for the projects. ChesCo’s comprehensive investigations provided critical insights for safe and efficient substation construction, supporting NEA’s efforts to enhance power transmission within the Kathmandu Valley.