Skip links
BudhiGandaki Prok

BUDHI GANDAKI PROK HYDROELECTRIC PROJECT

Chilime Engineering & Services Company Ltd. has completed the topographical survey and submitted the Feasibility study, and is currently undertaking the preparation of EPC tender documents and EIA study of Budhi Gandaki Prok Hydroelectric Project

Location: Gorkha

River: Budhi Gandaki

Type: Run-of-river, Design Discharge: 105.5 m3/s

Gross Head:  660 m

Installed capacity: 420 MW

Annual Energy:  2395.54 GWh

Client: Chilime Hydropower Company Ltd.