Marshyangdi Nadi PRoR HPP
The Marsyangdi Nadi Peaking Run-of-River (PRoR) Hydropower Project (MNPRORHPP) was identified by the M.A Power Pvt. Ltd as a potential project with an installed capacity of 90 MW and one-hour daily peaking. The MNPRORHPP is located in Bhanu Municipality of Tanahu; Rainas Municipality of Lamjung, and Palungtar Municipality of Gorkha in Gandaki Province of Nepal. The project utilizes 118.78 m3/s of design discharge at 40% exceedance probability and a gross head of 94.20 m to produce 90 MW hydroelectricity with one-hour daily peaking. The Power Purchase Agreement (PPA) of the project has already been signed with Nepal Electricity Authority (NEA) for 90 MW installed capacity. ChesCo is entrusted for Providing Review of Feasibility Study Report of Marshyangdi Nadi PRoR HPP (90 MW).